| Installation usually consists of the following steps |
 |
Unpacking the equipment |
 |
Cabinet Placement |
 |
Installing the MCU (Main Control Unit) and PDP (Power Distribution Panel). |
 |
Interconnecting Units |
 |
Building Wiring and Connections |
 |
Routing FXS cables at MDF frame and kroned. |
 |
Routing E1 cable at TX. rack and kroned. |
 |
Power Connections - AN2K Equipment |
 |
Installing the 3M Modules |
 |
Port Testing |